An ice storm sent the power crashing off throughout the Willamette Valley this month. At first, just a two-hour morning blackout, but that same afternoon the power went down and stayed down for 20 hours. This happened about an hour before sunset.
As I put my backup plans in place, I couldn’t help but remember that the Oregon Seismic Safety Advisory Commission had recently issued a document stating that in the event of a severe earthquake (which is overdue here), it could be 3 to 4 months before power would be restored to the Valley. All through the night and the next day, I held that fact in mind, as I both prided myself on being mostly prepared and found out what pieces were still not in place. For those who either haven’t started preparing, or who haven’t been tested recently, I want to describe the situation and the lessons I learned.